There are a few projects showcased below that I worked on in the field and handled fulltime; however, I also supported several projects technically from the back office. Due to size constraints, those are not listed here. I spent a significant portion of my expertise in the technical office, where I handled cost estimation, tendering, procurement, designing, reporting, and coordinating several projects.

Ongoing Projects
Baheej.png

Position: Contracts Head

Client: Baheej Investment Company 

Project: Yanbu Activation Project

Location: Yanbu

Duration: 3.5 Years

Job DescriptionA milestone project that I will never forget, this ambitious initiative aims to enhance the tourism appeal of Yanbu as a destination through the development of four distinct hospitality projects. For the first time AWN enterprises join with ASFAR (PIF) which worth Hundreds of Million. I am handling the contracts on behalf of MAB Consult in Baheej Portfolio Management (PMC). The project comprises four different components: a beach club, a lifestyle hotel, a marine conservation center, and a wellness resort, spanning approximately 120,000 m². I oversee the entire tendering process, ensuring that all aspects of contract management are properly handled. I have proactively supported the program from the feasibility study and have successfully completed the pre-contract stage for more than 35 scopes and appointment of 40+ contractors in the portfolio for various scopes such as  feasibility studies, traffic impact studies, soil investigations, branding, marketing, hospitality advisory, marine feasibility, various operators, consultants, hoarding and fencing, PR consultancy, digital twin technology, cost assessment, concept design, environmental studies, geotechnical studies, timelapse, engineering design, marketing films, exhibitions, and enabling works and Main Contractor for all 4 projects individually.

Baheej.png

Position: Project Manager

Client: Baheej Investment Company

Project: JABA & OPAL Retail Store

Location: Yanbu

Duration: 5 Months

Job Description: An interesting project within the Baheej Portfolio is the design and construction of a retail store for JABA and OPAL Diving Club. The interior and MEP design were completed by Space Architectural Studio, while construction was handled by ARAM Est. The existing building covers an area of approximately 200 m². The scope of work includes demolition, structural repair, design, procurement, and construction, leading up to the handover.

Completed Projects
TMCC

Position: Associate Project Manager

Client: Tamimi Markets Company Ltd. (Own Project)

Project: Port Warehouse Renovation

Location: Dammam bonded Zone, Mena Port

Duration: 8 Months

Job Description : Complete Renovation of 4 warehouses . The scope of work includes, Demolition of flooring, Repair, supply and apply Epoxy with screed, Supply and installation of cold room panels, doors, refrigeration units, lightings, electrical panel board for new Chiller and Freezer storage Facility, Construction of New Office room, Breakroom and WC facilities with complete MEP works and IT, Warehouse Floor signages and supply, Installation of Pallet racking system, Installation of scissor lift & packing equipment, supply and Installation of Steel structure for Mezzanine floor with epoxy flooring.

Aerophobic Farm.png
ZERO
MITSUI
TMCC

Position: Associate Project Manager

Clients: Tamimi Markets Company Ltd, Mitsui & Co(Japan) and Zero (Italy) (Own Project)

Project: Aerophobic Farm

Location: Al Kharj, Saudi Arabia

Duration:  April 2022 to July 2023

About the Project: Tamimi Markets formed a joint venture with Japan’s Mitsui & Co. and Italian agricultural technology provider Zero SRL to develop the Kingdom’s first smart farms

Job Description: The project involved a turnkey contract covering complete earthworks, structural, infrastructural, and MEP works for a total area of 7500 m², with a built-up area of approximately 6850 m². My role encompassed various responsibilities from the project's inception. This included collaborating with the technology provider to define the facility, preparing cost plans for both the concept and design phases, and coordinating with designers throughout the process. I was also responsible for managing the tendering process, evaluating the scope of work completed by contractors, other Consultants and overseeing their activities on-site while reporting to the Regional Manager and Project Director. Additionally, I handled the procurement and installation of the cold storage facility, reviewed and approved the mechanical designs, and ensured thorough testing and commissioning of the project.

ABC .png
ABC

Position: Mechanical Chief

Client: Al Jomaih Beverages Co. Ltd.

Main Contractor : Tek Yapi Construction and Trading Corporation

Project: Pepsi Bottling Logistics Center

Location: Oyun, Al Ahsa, Saudi Arabia

Duration: July 2019 to February 2020

Job Description: BIM Designing, HVAC, Firefighting, Plumbing, Under Ground/ Above Ground Piping, Etc

PEP

Position: Mechanical Chief

Client: Saudi Snack Food Limited (PepsiCo)

Main Contractor : Tek Yapi Construction and Trading Corporation

Project: Frito-Lay Potato Snack Food Production Plant Extension

Location: 2nd Industrial Area, Dammam, Saudi Arabia

Duration: February 2019 to December 2019

Job Description: BIM Designing, HVAC, Firefighting, Plumbing, Under Ground/ Above Ground Piping, Etc

MMM

Position: Mechanical Engineer

Client: 3M Manufacturing Co.

Main Contractor : Tek Yapi Construction and Trading Corporation

Project: Manufacturing Facility

Location: 3rd Industrial City, Dammam, Saudi Arabia

Duration: January 2018 to December 2019

Job Description: HVAC, Firefighting, Plumbing, Under Ground/ Above Ground Piping, Etc

SA

Position: Project Engineer

Client: Saudi Aramco

Main Contractor : Saudik Contracting Company Limited

Project: Source Control for ERDD Facilities

Location: Al Hasa, Saudi Arabia

Duration: July 2016 to October 2016​

Job Description: : Technical Bidding and Project In charge,(Excavation, Backfilling, Removal of Under Ground piping, Installation of new RTR pipeline, Testing & Commissioning).

SA

Position: Project Engineer

Client: Saudi Aramco

Main Contractor : Saudik Contracting Company Limited

Project: Energy Science Center Lobby Upgrading at Dhahran

Location: Daharan, Saudi Arabia

Duration: February 2016 to August 2016​

Job Description: : Technical Bidding and Project In charge (Refurbishment of the whole building)

PEP

Position: Mechanical Site Engineer

Client: Saudi Snack Food Limited (Pepsi Co.)

Main Contractor : Tek Yapi Construction and Trading Corporation

Sub Contractor: Saudik Contracting Company Limited

Project: Frito-Lay Potato Snack Food Production Plant

Location: 2nd Industrial Area, Dammam, Saudi Arabia

Duration: April 2014 to December 2015​

Job Description: : HVAC, Firefighting, Plumbing, Under Ground/ Above Ground Piping, Etc.

SA

Position: Mechanical Site Engineer

Client: Saudi Aramco

Main Contractor : STFA

Sub Contractor: Saudik Contracting Company Limited

Project: Dareen Fishing Port Expansion

Location: Al Qatif, Saudi Arabia

Duration: December 2013 to March 2014

Job Description: HVAC, Firefighting, Plumbing.